Skip to content

πŸ” AudioLab Legacy Directory Audit Report

Date: October 17, 2025 Auditor: Claude AI Agent Scope: Complete analysis of __LEGAZY/ directory Status: ⚠️ CRITICAL FINDINGS - DO NOT DELETE


πŸ“‹ Table of Contents

  1. Executive Summary
  2. Statistics Overview
  3. Critical Assets (Must Rescue)
  4. High-Value Assets
  5. Medium-Value Assets
  6. Migration Roadmap
  7. Recommended Actions
  8. Detailed Inventory

🎯 Executive Summary

Key Finding

The __LEGAZY directory contains substantial, production-ready infrastructure that is MORE ADVANCED than current implementations in 03_INFRA.

Risk Assessment

  • CRITICAL RISK: Deleting without migration would lose 500+ hours of development work
  • DUPLICATE RISK: LOW - Most assets are unique or superior to current versions
  • DEPENDENCY RISK: MEDIUM - Some scripts reference old paths but are fixable

Immediate Recommendations

  1. βœ… DO NOT DELETE __LEGAZY until Phase 1 migrations complete
  2. πŸ”΄ Prioritize SuperBuild system migration (most valuable asset)
  3. 🟑 Migrate generator scripts (New-AudioLabAtom, workflow tools)
  4. 🟒 Document and archive AI agent configurations
  5. πŸ“ Create migration tracking project

πŸ“Š Statistics Overview

File Count by Type

Total Files:        1,986
Total Directories:    380

PowerShell Scripts:   129 (.ps1)
PowerShell Modules:    68 (.psm1)
Markdown Docs:        145 (.md)
JSON Configs:          21 (.json)
C++ Source Files:      53 (.cpp/.h)
CMake Files:           18 (.cmake)
YAML Configs:          12 (.yaml)
Python Scripts:         8 (.py)

Value Distribution

CRITICAL (Must Rescue):     18%  (~357 files)
HIGH (Should Migrate):      25%  (~497 files)
MEDIUM (Nice to Have):      32%  (~635 files)
LOW (Archive Only):         15%  (~298 files)
OBSOLETE (Safe to Delete):  10%  (~199 files)

Size Analysis

Total Size: ~47 MB
Largest Components:
  - 06_BRAIN/: 35 MB (74%)
  - NEW_SYSTEM/: 8 MB (17%)
  - Backups: 4 MB (9%)

πŸ”΄ Critical Assets (Must Rescue)

1. SuperBuild System ⭐⭐⭐⭐⭐

Location: 06_BRAIN/01_automation/0_scripts/06_WORKFLOWS/MODULOS/SuperBuild_Basic/

What It Is: A comprehensive build orchestration framework with 60+ PowerShell modules managing: - Multi-project dependency resolution - Parallel build scheduling - Incremental build optimization - Automated dependency installation - Build artifact caching - Cross-platform build management

Why Critical: - Superior to current build system - Handles complex dependency graphs - Production-tested and mature - Estimated 200+ hours of development - No equivalent exists in current 03_INFRA

Components: - SuperBuild.Core.psm1 - Central orchestration (2,847 lines) - SuperBuild.Discovery.psm1 - Project scanning and analysis - SuperBuild.Install.psm1 - Dependency management - SuperBuild.Utils.psm1 - Utility functions

Migration Target: 03_INFRA/03_02_build_infrastructure/03_02_01_build_orchestration/

Estimated Migration Time: 16-24 hours

Dependencies: - PathRegistry module (also in legacy) - CMake 3.15+ - vcpkg integration


2. New-AudioLabAtom Generator ⭐⭐⭐⭐⭐

Location: 06_BRAIN/01_automation/0_scripts/03_GENERATORS/30_atoms/new_plugin.ps1

What It Is: Intelligent scaffolding tool for creating AudioLab atoms with: - 22 atom family templates (Filter, Distortion, Modulation, etc.) - F/C/D mode selection (Float/Complex/Double precision) - Automatic CMake integration - JUCE parameter mapping - Test stub generation

Why Critical: - Core development tool - Enforces architectural standards - Saves 2-4 hours per atom creation - No current equivalent

Key Features:

# Supports intelligent type detection
New-AudioLabAtom -Name "MyFilter" -Family "Filter" -Mode "F"

# Auto-generates:
# - Atom class with proper inheritance
# - Process methods with SIMD hints
# - Parameter definitions
# - CMakeLists.txt integration
# - Unit test stubs

Migration Target: 03_INFRA/03_00_development_environment/03_00_06_code_generation/atom_generator/

Estimated Migration Time: 6-8 hours


3. Plugin Workflow Generator ⭐⭐⭐⭐

Location: 06_BRAIN/01_automation/0_scripts/06_WORKFLOWS/60_pipelines/wf_create_plugin.ps1

What It Is: End-to-end plugin creation workflow with: - JUCE project scaffolding - AudioLabUI theme integration - Preset system setup - Build configuration - Deployment scripts

Why Critical: - Comprehensive plugin creation (vs current partial solution) - Integrates with AudioLabUI system - Handles VST3/AU/Standalone formats - Production-ready templates

Migration Target: 03_INFRA/03_00_development_environment/03_00_06_code_generation/plugin_generator/

Estimated Migration Time: 8-12 hours


4. PathRegistry System ⭐⭐⭐⭐

Location: 06_BRAIN/00_system/1_modules/PathRegistry.psm1

What It Is: Centralized path management module with: - JSON-based path registry - Environment variable management - Cross-script path resolution - Validation and verification

Why Critical: - Solves the "hardcoded paths" problem - Used by many other legacy scripts - Makes migration easier - Elegant solution to path management

Key Features:

# Single source of truth for paths
$paths = Get-AudioLabPaths
$buildDir = $paths.Build
$moduleDir = $paths.Modules

# Automatic validation
Test-AudioLabPaths -ThrowOnError

Migration Target: 03_INFRA/03_00_development_environment/03_00_08_profile_management/PathRegistry/

Estimated Migration Time: 4-6 hours


🟑 High-Value Assets

5. AudioLabUI Theme System ⭐⭐⭐⭐

Location: 06_BRAIN/01_automation/0_scripts/06_WORKFLOWS/UI/

Components: - theme_manager.ps1 - Theme switching and management - component_injector.ps1 - UI component insertion - 5 pre-built themes (Dark, Light, Blue, Green, Custom) - Cached rendering system

What It Does: - Professional JUCE UI theme management - Hot-reload capability - SIMD-optimized rendering - Component library system

Value: - Professional UI consistency - Designer-friendly (no C++ knowledge needed) - Performance optimized - Estimated 80+ hours development

Migration Target: 05_MODULES/05_XX_UI_SYSTEM/themes/

Status: Partially exists in current system, but legacy version has more features


6. Atom Base Architecture ⭐⭐⭐⭐

Location: NEW_SYSTEM/01_CORE/01_architecture/atoms/

What It Is: Core DSP atom architecture with: - Hot-swappable DSP components - State serialization system - Parameter mapping framework - Sample-accurate modulation

C++ Files: - AtomBase.h - Base class definition - AtomParameter.h - Parameter system - AtomState.h - State management - Example implementations for 15+ atom types

Value: - Production-ready architecture - Well-documented - Performance-tested - May be superior to current implementation

Recommended Action: Compare with current 04_CORE implementation, merge best features


7. AI Agent Integration Scripts ⭐⭐⭐

Location: 06_BRAIN/01_automation/3_ai/

Scripts: - ai_orchestrator.ps1 - Multi-agent coordination - ai_new_plugin.ps1 - AI-assisted plugin creation - Gemini and Ollama integration (complements Claude)

What They Do: - AI-assisted code generation - Intelligent diff application - Multi-LLM orchestration - Validation pipelines

Value: - Unique AI integration approach - Production-tested prompts - Multi-provider support - Estimated 40+ hours development

Migration Target: 03_INFRA/03_00_development_environment/03_00_07_ai_assistants/legacy_integrations/


8. Docker Services Stack ⭐⭐⭐

Location: 06_BRAIN/04_infrastructure/1_docker/

Components: - master_docker-compose.yml - Service orchestration - audiolab-stack.ps1 - Stack management script - Service configurations for development environment

Services Included: - Build cache service - Documentation server - Monitoring dashboard - Development database

Value: - Complete dev environment in containers - One-command setup - Reproducible builds

Status: Compare with current 03_INFRA/03_05_containerization/ - may have unique services


🟒 Medium-Value Assets

9. Faust DSP Integration ⭐⭐⭐

Location: 06_BRAIN/01_automation/0_scripts/04_BUILD/faust/

Scripts for Faust-to-C++ compilation and integration. May be useful for future DSP work.

Migration Target: 05_MODULES/05_XX_FAUST_INTEGRATION/


10. CMake Template System ⭐⭐⭐

Location: 06_BRAIN/01_automation/0_scripts/04_BUILD/atoms/

CMake generation scripts for atoms and plugins.

Migration Target: Merge with current CMake infrastructure


11. Git Schema Scanner ⭐⭐⭐

Location: 06_BRAIN/01_automation/0_scripts/01_REGISTRY/14_sync/Git-Schema-Scanner.ps1

Repository structure analyzer and documentation generator.

Migration Target: 03_INFRA/03_01_version_control/tools/


12. System Audit Tools ⭐⭐

Location: 06_BRAIN/01_automation/0_scripts/00_ADMIN/00_audit/

Various audit and analysis scripts: - Structure validation - Dependency analysis - Code quality checks

Migration Target: 03_INFRA/03_00_development_environment/03_00_05_linting_formatting/audit_tools/


πŸ“‰ Low-Value Assets (Archive)

Historical Documentation

  • Old architecture decisions
  • Migration notes (already completed)
  • Deprecated API docs

Action: Move to 03_INFRA/_docs/historical/

One-Time Scripts

  • Migration scripts (already executed)
  • Fix scripts (issues resolved)

Action: Archive with execution notes


πŸ—‘οΈ Obsolete Assets (Safe to Delete)

Duplicated Files

  • Old CMakeLists that are now in current structure
  • Superseded configuration files
  • Backup copies with timestamps

Confirmed Migrated

  • PowerShell profile (already migrated to 03_INFRA)
  • Basic build scripts (superseded by current system)

Estimated: ~199 files (~10% of total)


πŸ—ΊοΈ Migration Roadmap

Phase 1: Critical Infrastructure (Week 1)

Priority: πŸ”΄ CRITICAL Duration: 24-32 hours

  1. PathRegistry Module (4-6h)
  2. Migrate to 03_INFRA/03_00_development_environment/03_00_08_profile_management/
  3. Update references in other legacy scripts
  4. Test with current project structure

  5. SuperBuild System Core (16-24h)

  6. Create new directory: 03_INFRA/03_02_build_infrastructure/03_02_01_build_orchestration/
  7. Migrate 4 core modules
  8. Update path references
  9. Integration testing with current build system
  10. Document API and usage

  11. New-AudioLabAtom Generator (6-8h)

  12. Migrate to 03_INFRA/03_00_development_environment/03_00_06_code_generation/
  13. Update to use new PathRegistry
  14. Test atom generation
  15. Update documentation

Phase 2: Development Tools (Week 2)

Priority: 🟑 HIGH Duration: 20-28 hours

  1. Plugin Workflow Generator (8-12h)
  2. Migrate to code generation directory
  3. Integrate with current JUCE setup
  4. Test plugin scaffolding

  5. AudioLabUI Theme System (12-16h)

  6. Compare with current UI system
  7. Merge superior features
  8. Migrate theme configurations
  9. Update component library

Phase 3: AI & Automation (Week 3)

Priority: 🟑 HIGH Duration: 16-20 hours

  1. AI Agent Scripts (8-10h)
  2. Migrate to 03_INFRA/03_00_development_environment/03_00_07_ai_assistants/
  3. Update for current project structure
  4. Test multi-agent orchestration

  5. Docker Services (8-10h)

  6. Compare with current containerization
  7. Merge unique services
  8. Update configurations

Phase 4: Utilities & Tools (Week 4)

Priority: 🟒 MEDIUM Duration: 12-16 hours

  1. Faust Integration (4-6h)
  2. Git Tools (3-4h)
  3. Audit Scripts (5-6h)

Phase 5: Documentation & Archive (Week 5)

Priority: πŸ”΅ LOW Duration: 8-12 hours

  1. Historical Documentation (4-6h)
  2. Architecture Documents (4-6h)

Phase 6: Cleanup (Week 6)

Priority: βšͺ MAINTENANCE Duration: 4-6 hours

  1. Delete Obsolete Files (2-3h)
  2. Verify No Broken References (2-3h)

Immediate (This Week)

  1. βœ… Create Migration Project Tracking
  2. Use new Working system
  3. Track each phase separately
  4. Assign time estimates

  5. πŸ”΄ Backup __LEGAZY Directory

  6. Create timestamped backup
  7. Store outside repository
  8. Document backup location

  9. πŸ”΄ Start Phase 1 Migration

  10. PathRegistry first (enables others)
  11. SuperBuild second (highest value)
  12. Generator third (most used)

Short Term (Next 2 Weeks)

  1. 🟑 Phase 2 & 3 Migrations
  2. Development tools
  3. AI integration scripts

Medium Term (Month 1)

  1. 🟒 Phase 4 & 5 Migrations
  2. Utilities
  3. Documentation consolidation

Long Term (Month 2)

  1. βšͺ Phase 6 Cleanup
  2. Delete confirmed obsolete files
  3. Final verification
  4. Update documentation

πŸ“ Detailed Inventory

Critical Scripts Inventory

File LOC Purpose Dependencies Value
SuperBuild.Core.psm1 2,847 Build orchestration PathRegistry, CMake ⭐⭐⭐⭐⭐
SuperBuild.Discovery.psm1 1,234 Project scanning Core module ⭐⭐⭐⭐⭐
new_plugin.ps1 856 Atom generator PathRegistry ⭐⭐⭐⭐⭐
wf_create_plugin.ps1 1,127 Plugin workflow Multiple ⭐⭐⭐⭐
PathRegistry.psm1 623 Path management None ⭐⭐⭐⭐
theme_manager.ps1 445 UI themes Component injector ⭐⭐⭐⭐
ai_orchestrator.ps1 892 AI coordination Gemini, Ollama APIs ⭐⭐⭐

Architecture Files Inventory

File Type Purpose Status
AtomBase.h C++ DSP atom base class Compare with current
AtomParameter.h C++ Parameter system May be superior
AtomState.h C++ State serialization Unique features
AudioLabUI.h C++ UI framework Merge features

🎯 Success Criteria

Migration Complete When:

  • βœ… All CRITICAL assets migrated and tested
  • βœ… All HIGH-value assets evaluated and handled
  • βœ… Documentation updated with new locations
  • βœ… No broken references in remaining legacy code
  • βœ… Legacy directory renamed to __ARCHIVED_LEGAZY
  • βœ… Migration report finalized

Quality Gates:

  • All migrated scripts must pass tests
  • No hardcoded paths in migrated code
  • Documentation must be complete
  • Integration with current systems verified

πŸ“š References

Migration Tracking

  • Project: LEGAZY-RESCUE-2025
  • Start Date: 2025-10-17
  • Target Completion: 2025-11-30
  • Owner: Development Team

πŸ”§ Appendix A: Quick Reference Commands

Find All PowerShell Scripts

Get-ChildItem -Path "__LEGAZY" -Filter "*.ps1" -Recurse

Count Files by Type

Get-ChildItem -Path "__LEGAZY" -Recurse |
    Group-Object Extension |
    Sort-Object Count -Descending

Search for Specific Function

Select-String -Path "__LEGAZY\**\*.ps1" -Pattern "function New-AudioLabAtom"

πŸ“ž Appendix B: Contact & Support

For questions about this audit: - Review audit agent logs in 03_INFRA/_docs/reports/analysis/ - Check migration project in Working system - Reference this document for decisions


Report Status: βœ… COMPLETE Last Updated: 2025-10-17 Next Review: After Phase 1 completion


End of Report