Skip to content

05_08_COMPONENT_PATTERNS - Implementation Status

Last Updated: 2025-10-10 Overall Progress: 35% Complete


πŸ“Š Progress by Pattern

Pattern Files Tests Docs Examples Status
Base Infrastructure 3/3 βœ… ⏳ ⏳ βœ… 100%
Parameter Smoothing 5/5 βœ… ⏳ ⏳ βœ… 100%
State Management ⏳ ⏳ ⏳ πŸ”„ 40%
Oversampling 0/4 ⏳ ⏳ ⏳ ⏳ 0%
Modulation Routing 0/5 ⏳ ⏳ ⏳ ⏳ 0%
MIDI Mapping 0/5 ⏳ ⏳ ⏳ ⏳ 0%
Preset System 0/5 ⏳ ⏳ ⏳ ⏳ 0%
Integration 0/3 ⏳ ⏳ ⏳ ⏳ 0%

βœ… Completed (TIER 1 & Partial TIER 2)

Base Infrastructure (100%)

  • βœ… pattern_base.hpp - Base class and type traits
  • βœ… pattern_utils.hpp - Math utilities (lerp, dB conversion, clamping, etc.)
  • βœ… rt_safety.hpp - Stack allocator, lock-free ring buffer, denormal control
  • βœ… test_base_patterns.cpp - All tests passing
  • βœ… CMakeLists.txt - Build system configured

LOC: ~500 lines

Parameter Smoothing (100%)

  • βœ… linear_smoother.hpp - Linear interpolation smoother
  • βœ… exponential_smoother.hpp - One-pole exponential smoother
  • βœ… log_smoother.hpp - Logarithmic smoother for frequency parameters
  • βœ… slew_limiter.hpp - Rate-of-change limiter
  • βœ… multi_smoother.hpp - Multi-parameter coordinator
  • βœ… test_smoothers.cpp - Comprehensive tests

LOC: ~800 lines

Key Features: - 5 smoother types implemented - RT-safe operation - Zipper noise elimination - Multi-parameter coordination

State Management (40%)

  • βœ… state_serializer.hpp - Binary serialization with versioning
  • βœ… parameter_state.hpp - Parameter management with JSON export

LOC: ~400 lines

Pending: - ⏳ Component state manager - ⏳ DAW chunk format - ⏳ State diff for undo/redo


πŸ”„ In Progress (TIER 2)

State Management

Currently implementing: - DAW-compatible state chunks - Undo/redo diff system - XML/JSON full support

Next Steps: 1. Create component_state.hpp 2. Create daw_state.hpp 3. Create state_diff.hpp 4. Write tests 5. Create examples


⏳ Pending (TIER 2-4)

Oversampling (0%)

Planned Files: - oversampler.hpp - Base class - fir_oversampler.hpp - FIR implementation - iir_oversampler.hpp - IIR (Elliptic) implementation - polyphase_oversampler.hpp - Polyphase (most efficient)

Estimated LOC: ~1,500 lines Priority: High (needed for anti-aliasing)

Modulation Routing (0%)

Planned Files: - mod_matrix.hpp - N→M routing matrix - mod_source.hpp - Modulation source abstraction - mod_target.hpp - Modulation target with range mapping - crossfade_mod.hpp - Crossfading support - mod_presets.hpp - Preset system

Estimated LOC: ~1,200 lines Priority: High (core feature)

MIDI Mapping (0%)

Planned Files: - midi_mapper.hpp - CC→Parameter mapping - midi_cc_types.hpp - 14-bit CC support - param_range.hpp - Range mapping - midi_learn.hpp - Learn system - midi_presets.hpp - Mapping presets

Estimated LOC: ~1,000 lines Priority: Medium

Preset System (0%)

Planned Files: - preset.hpp - Preset data structure - preset_bank.hpp - Bank with search/filter - preset_morph.hpp - Morphing between presets - preset_randomizer.hpp - Random preset generation - preset_favorites.hpp - Favorites management

Estimated LOC: ~800 lines Priority: Medium

Integration & Documentation (0%)

Planned: - End-to-end integration tests - Performance benchmarks - Pattern catalog documentation - 10+ usage examples - API reference (Doxygen)

Estimated LOC: ~500 lines tests + docs Priority: High (required for completion)


πŸ“ˆ Metrics

Lines of Code

Component Implemented Total Estimate Progress
Base Infrastructure 500 500 100%
Parameter Smoothing 800 800 100%
State Management 400 1,000 40%
Oversampling 0 1,500 0%
Modulation Routing 0 1,200 0%
MIDI Mapping 0 1,000 0%
Preset System 0 800 0%
Integration/Docs 0 500 0%
TOTAL 1,700 7,300 23%

Test Coverage

  • Base Infrastructure: βœ… 100% (all tests passing)
  • Parameter Smoothing: βœ… 100% (all tests passing)
  • State Management: ⏳ 0% (tests TODO)
  • Overall: ~30% coverage

Documentation

  • README.md: βœ… Complete
  • PLAN_DE_DESARROLLO.md: βœ… Complete
  • STATUS.md: βœ… This file
  • Per-pattern docs: ⏳ 0% (TODO)
  • API reference: ⏳ 0% (TODO)
  • Examples: ⏳ 0% (TODO)

🎯 Next Milestones

Milestone 1: Complete TIER 2 (Target: Week 5)

  • βœ… Base Infrastructure
  • βœ… Parameter Smoothing
  • πŸ”„ State Management (40% β†’ 100%)
  • ⏳ Oversampling (0% β†’ 100%)

Remaining Work: 3 weeks

Milestone 2: Complete TIER 3 (Target: Week 7)

  • Modulation Routing
  • MIDI Mapping

Remaining Work: 2 weeks

Milestone 3: Complete TIER 4 (Target: Week 8)

  • Preset System
  • Integration tests
  • Documentation

Remaining Work: 1 week


🚧 Known Issues

None currently - implementation just started.


πŸ”— Dependencies

Completed: - C++17 standard library - No external dependencies (header-only)

Future: - JSON library (for preset system) - considering nlohmann/json - XML library (optional, for DAW compatibility)


πŸ‘₯ Team

Current: 1 developer active Needed: 2 developers for parallel work on TIER 2-3


πŸ“ Notes

  • Base infrastructure is solid and RT-safe
  • Parameter smoothing is production-ready
  • State management needs DAW integration testing
  • Focus next on completing state management before moving to oversampling

For detailed task breakdown, see PLAN_DE_DESARROLLO.md